โšก Onwuachi Control Plane

Signals

Operational and platform telemetry:

Entries (9)

platform-change Refreshed hugo Jul 25, 2026

Pulled latest image and restarted platform-hugo.service

platform-change Refreshed hugo Jul 25, 2026

Pulled latest image and restarted platform-hugo.service

platform-change Refreshed hugo Jul 24, 2026

Pulled latest image and restarted platform-hugo.service

platform-change Refreshed hugo Jul 24, 2026

Pulled latest image and restarted platform-hugo.service

platform-change Refreshed hugo Jul 21, 2026

Pulled latest image and restarted platform-hugo.service

platform-change Refreshed hugo Jul 21, 2026

Pulled latest image and restarted platform-hugo.service

platform-change Refreshed hugo Jul 21, 2026

Pulled latest image and restarted platform-hugo.service

platform-change Refreshed hugo Jul 21, 2026

Completed a comprehensive platform infrastructure modernization and re-deployed the platform-hugo.service application layer.

Infrastructure Updates

  • OS Layer: Migrated base host environment to Ubuntu 24.04 LTS (Noble) running the Linux 6.17 AWS kernel.
  • Container Architecture: Upgraded underlying container layers to Docker Engine 29.x and containerd 2.2.x.

Deployment & Rehydration

The platform execution has shifted entirely to an Immutable Infrastructure model to eliminate configuration drift:

  1. Rebuilt system images from source using HashiCorp Packer.
  2. Provisioned fresh EC2 instances via HashiCorp Terraform using the newly baked AMIs.
  3. Automated final configuration rehydration utilizing AWS Systems Manager.
  4. Pulled the latest application image and successfully restarted platform-hugo.service.

platform-change Ubuntu Fleet Upgraded to 24.04 Jul 20, 2026

Successfully planned and executed a fleet-wide production operating system upgrade from Ubuntu 20.04 to Ubuntu 24.04 LTS. The rollout encompassed approximately 36 cloud instances alongside physical edge devices.

Execution Highlights

  • Multi-Hop Pathing: Validated a repeatable multi-hop upgrade path across highly mixed instance types, explicitly targeting legacy physical hardware running non-standard boot configurations.
  • Health Validation: Implemented an end-to-end pre-flight and post-upgrade validation checklist verifying OS stability, container runtime health, storage persistence, and application-layer availability.
  • Zero-Downtime Orchestration: Coordinated sequenced execution over dozens of active production hosts using consistent, auditable rollback procedures, resulting in zero unplanned downtime.

Root Cause Analysis & Remediation

During the rollout, engineering isolated an upstream container runtime regression that silently lowered critical resource limits under high production loads.

System Context